Montline.

Survey deliverables are judged by repeatability. The same method flown in different epochs must produce comparable results, or progress measurement is fiction.

Ground control or RTK availability, flight-plan repetition, and the format your downstream tooling accepts are the three things that decide it. Each is covered in turn below.

10 topics

Survey and Construction Management

Progress imagery comparison, earthwork volume workflow, stockpile change tracking, terrain change analysis and BIM reconciliation.

Orthophoto and construction progress
Orthophoto and construction progressSurvey and Construction Management

Topics in Survey and Construction Management

Topics are published on a rolling basis. Nothing goes live before its specifications and sources have been verified.

Tell us what the system needs to do

We will tell you what is achievable, what it takes, and what we would need from you.

Discuss Your Project