Montline.

Blog · Custom Engineering Notes

Writing a Customization Requirements Document

A requirements document is a contract with your future self. Write it so that a disagreement in month six can be settled by reading it.

1 of 10Method note

Overview

  • One requirement per line, measurable, with the method of verification next to it.
  • Separate must-have from nice-to-have explicitly; a flat list guarantees an argument about priority.
  • Write the exclusions. Most late disputes are about something nobody said was out of scope.
  • Name the acceptance authority on the document itself.

Related pages

More in this area

Tell us what the system needs to do

We will tell you what is achievable, what it takes, and what we would need from you.

Discuss Your Project