Montline.

Blog · Custom Engineering Notes

Preparing for Field Testing

Field testing is expensive per hour, so most of the preparation is about not wasting the hours you have.

7 of 10Method note

Overview

  • Charge everything the night before and verify it, rather than discovering it at the site.
  • Bring a written test card: which test, what counts as a pass, what to record.
  • Have a plan B for the weather and a plan C for access.
  • Assign one person to record data and nothing else; the team that is also flying will not record it reliably.

Related pages

More in this area

Tell us what the system needs to do

We will tell you what is achievable, what it takes, and what we would need from you.

Discuss Your Project