Montline.

Blog · Custom Engineering Notes

Planning from Pilot to Volume Delivery

The step from a working pilot to repeatable delivery is a manufacturing and process step, not a technical one.

10 of 10Method note

Overview

  • Write the production configuration down and freeze it; a pilot that keeps changing cannot be volume-delivered.
  • Identify which steps are still dependent on a specific individual, and remove that dependency.
  • Build the test fixtures and acceptance routine before the volume order, not during it.
  • Plan the spares and support commitment at the same time as the delivery schedule.

Related pages

More in this area

Tell us what the system needs to do

We will tell you what is achievable, what it takes, and what we would need from you.

Discuss Your Project